Home > Glossary > Mrp/mrpii, Manufacturing Resource Planning
Meaning / Definition of
Mrp/mrpii, Manufacturing Resource Planning
Categories: Operation and Production,
—process for determining material, labor and machine requirements in a manufacturing environment. MRPII is the consolidation of material requirements planning (MRP), capacity requirements planning (CRP), and Master Production Scheduling (MPS). MRP was originally designed for materials planning only. When labor and machine (resources) planning were incorporated it became known as MRPII. Today the definition of MRPII is generally associated with MRP systems.
Featured term of the day
Definition / Meaning of
Homeowners Policy Special Form 3 (HO 3)
Categories: Insurance,
removed
Most popular terms
1. Systematic Withdrawal2. Savings Bonds
3. Floating Excess Policy
4. Storm Surge
5. Target Date Fund
6. Management Liability Insurance
7. Portable Benefits
8. Section 8 Declaration Of Excusable Nonuse
9. Contractors All Risks (CAR) Insurance
10. Call Option
Search a term
Browse by alphabet
A | B | C | D | E | F | G |
H | I | J | K | L | M | N |
O | P | Q | R | S | T | U |
V | W | X | Y | Z | # |
Browse by category
AccountingBanking
Bankruptcy Assistance
Bonds and Treasuries
Brokerages
Business and Management
Compliance and Governance
Credit and Debt
E-commerce
Economics
Estate Planning
Forex
Fraud
Fundamental Analysis
Futures
Global
Insurance
International Trade
Investing and Trading
Ipos
Legal
Loan and Mortgage
Mergers and Acquisitions
Mutual Funds
Operation and Production
Options
Patent
Personnel Management
Real Estate
Retirement and Pension
Statistics and Risk Management
Stocks
Strategies
Tax
Technical Analysis
Venture Capital